Hi.
I'm currently working on some basic cables. I want those cables to work the way that the TileEntityPipeTransferEnergy transfers the energy from TileEntityPipeTransferEnergy A to B. The transfer pipes should be connect
with some cables, but the energy should not go through these cables.
So actually, the energy goes directly from point A to B while skipping all cables along the way. This should however only work when point A and B are connected with a cable.
I
Hm, got some problems after adding the energy handling logic (WIP) to all the blocks:
@diesieben07 NullPointerException when having null as a side like you suggested.
Energy seems not to get transfered to other the transfer pipe at the end of the cable
Transfer Pipe:
Solar Panel update:
There is also no log output from transfer pipe with syso and when having it outside of the forEach loop, the log tells me the transfer pipe at